Drywall in Fargo
Scoped, Booked and Finished, Winter Included
A measured scope you can hold a second quote against, a start date that survives the winter, and one crew in the house from the first sheet to the last coat.
How the work is scoped, booked and finished
You get a measured scope and a firm start date before a single sheet of board is ordered or lifted.
Fargo Drywall Elite boards and finishes rooms across Fargo and the valley either side of it. The six steps below do not change with the size of the job, and the reason is the cold. Work that is sequenced loosely in July is work that stalls in February.
Six steps, every time. You tell us what the room is, somebody measures it on site inside the week, and a scope you can put beside another quote follows two working days later. Then protection and board over one to three days, tape and coats and sanding across two to four, and a prime, a vacuum and the keys back on the last day. A basement and a single wall run the same order and differ only in the middle.
One wall patched and finished is a two day job start to end. A whole lower level with a mechanical room to work around is nearer four weeks in deep winter, because coats take longer to give up their water when the furnace is fighting the outside. Your dates are on your quote.
Nothing is ordered before the scope is agreed and nothing is hung before there is heat in the room. Ring (701) 555-0132 and we will measure it and put a scope in your hands this week.
Six steps, and what each one costs in days
One order of work for every job on the books. The durations allow for how long compound takes to give up water in a heated house in winter.
-
Tell us what the room is
Same day
You describe the room, the damage or the plan, and you get told on the phone whether it is a half day, a week, or a job that needs a plumber or a roofer in front of it. Nothing is measured yet.
-
A measure on site
Within the week
Somebody comes out, measures every wall and ceiling, opens up enough to see what is behind the existing surface, and asks where the furniture and the family are going to live while the work runs.
-
A scope you can compare
Two working days
Board thickness, finish level, number of coats, texture and the start date all go in writing. You can hold it against the other two quotes line for line, which is the point of writing it that way.
-
Protection, then board
One to three days
Floors, doorways and vents get sealed before a sheet comes off the truck. Board goes up, screwed to framing at the spacing the sheet calls for, and the room stops being a room for a few days.
-
Tape, coat and sand
Two to four days
Three coats over the joints with real drying time between them, then sanding. This is the slow half of the job and it is the half that decides how the wall reads in low winter light.
-
Prime, vacuum, hand back
One day
The surface is primed so your painter is not the one who finds a defect, dust is vacuumed rather than swept into the air, scrap leave on the truck, and the floor goes back to being a floor.
Got a wall that needs to be flat by spring?
A free measure, and the coat count agreed before board arrives.
Why the same builders keep calling
Most of what separates two drywall quotes is not the price of the board. It is whether the scope is measured or estimated, whether the date holds in January, and whether one crew carries the room the whole way through. Those are the things below.
- 1. Measured on site, not off a sketch
- Somebody comes and measures the room before you get a number. A take off done over the phone is a guess with a price on it, and the difference turns up as a change order once the job is already open.
- 2. A scope you can compare
- Board thickness, finish level, corner bead and who moves the furniture are all named on the page. Two quotes are only comparable when both of them say what is in the number, and most of the time only one does.
- 3. Dates that hold through winter
- A start date given in November is given knowing what the drive and the heat in the building will be like. We would rather book you three weeks out and arrive than book you next week and call it off.
- 4. Heat before board
- Board does not go up in an unheated shell and coats do not go on over frost. If the heat is not in yet we will say so before the delivery lands, which is cheaper for you than a wall that has to come off again.
- 5. One crew, first sheet to last coat
- The people who hang it are the people who tape it and the people who sand it. Nothing is handed between outfits halfway, so nothing gets blamed on whoever was in the room before.
- 6. Primed before we leave
- A coat of primer goes on before we hand back, because primer is what shows up the flaw a work light hides. Better we find it on our last day than you find it after the paint is on.
Fargo Drywall Elite
The book runs three to four weeks out, and a leaking ceiling jumps to the front of it.
Fargo Drywall Elite hangs, tapes, finishes and textures board across Fargo and the Red River Valley towns around it, in houses, additions and commercial units alike. Three crews finish around a hundred and eighty jobs a year, working through winters most trades slow down for. Trading here since 2009.
Why a crew that knows a Fargo winter makes the difference
- Seventeen years hanging board through Red River Valley winters, since 2009
- A measure on site before anything is priced, never a number guessed over the phone
- The scope is written down so you can hold it against the other two quotes
- Compound sets fast in dry winter air, and the coats are timed for it
- Every surface is primed before we leave, so your painter is not the one who finds a defect
If a ceiling is staining after the melt, a wall needs drywall from scratch, or a room just needs finishing off, call (701) 555-0132 and somebody will come out and measure it. You get the scope in writing before any board is cut, and the schedule accounts for the drying time a Fargo winter actually needs.
Give us a call
Send us a message
1630 1st Ave N, Ste B, Fargo, ND, 58102
Where to find us